One of the biggest in Ireland. This demanding installation was for the aviation industry for pressurising product autoclaves.
This required heavy plant — over 30 tonnes — to be lifted into an elevated plant room 10 metres from ground level and positioned in place. Pipework in stainless steel welded connections and over 60,000 litre internal storage for the N2 Generation operational process and a massive 600,000 litre high pressure storage at 30 Bar, all installed while maintaining an uninterrupted supply for production!!
We met the challenge ![]()
![]()